405 Freeway Closures

 

Photo courtesy of DOT

Advisory: TRAFFIC ALERT: 405 Fwy closures start tonight, Friday at 7pm, from 101 Fwy to Getty Ctr Dr, Los Angeles, Caltrans & Metro News Release: Construction Notice, Mulholland Bridge at 405 Freeway

ATTENTION RESIDENTS AND BUSINESSES IN THE VICINITY OF THE MULHOLLAND BRIDGE AND THE I-405 SAN DIEGO FREEWAY

Caltrans and Metro News Release:

I-405 Sepulveda Pass Improvement Project

The contractor is scheduled to implement additional full directional freeway closures in order to further construct the falsework structure for the Mulholland Bridge. The falsework structure is designed to facilitate the reconstruction by providing temporary support to the bridge. Bridge girder plates will be temporarily placed above each bridge span and across each direction of the freeway roadway. The directional full freeway closures will be from the 101 freeway to the Getty Center Dr. ramps and are scheduled for six nights beginning Friday, March 2, 2012, weather permitting.

Each night, ramps within the freeway closure limits may begin to close as early as 7:00 pm and freeway lanes will begin to close as early as 10:00 pm, leading up to the full directional freeway closure between the hours of 12:00 am, midnight, and 5:00 am.

The table below provides details of the anticipated closure schedule:

March 2 & 3 (Fri. & Sat.) – Northbound I-405 freeway from Getty Center Drive to Ventura Blvd. (freeway lanes closures starting at 10:00 pm)

March 5 & 6 – Southbound I-405 freeway from the 101 freeway to Getty Center Dr. (freeway lanes closures starting at 10:00 pm)

March 12 & 13 – Southbound I-405 freeway from the 101 freeway to Getty Center Dr. (freeway lanes closures starting at 10:00 pm)

Where: Between the Getty Center Dr. ramps to the 101 freeway

What: Falsework construction to support the reconstruction of the Mulholland Bridge

When: Full directional freeway closures are anticipated to begin Friday, March, 2, 2012, and last approximately six nights, weather permitting. Each night, ramps within the freeway closures limits may begin to close as early as 7:00 pm and freeway lanes will begin to close as early as 10:00 pm, leading up to the full directional northbound freeway closure between the hours of 12:00 am, midnight, and 5:00 am.

What to expect: Sepulveda Blvd. will remain open during the nights of the full directional freeway closures and will
be used as a detour route. Detour maps are available at http://www.metro.net/405

Emergency access will be maintained at all times

For a listing of daily closures and latest updates visit our website at www.metro.net/405 or follow us on twitter: http://www.twitter.com/I_405 and Facebook at http://www.facebook.com/405project

For more information contact the Community Relations Construction Impact Team at 213-922-3665
Caltrans and Metro News Release:

http://www.metro.net/projects_studies/I405/images/notice_2012_0302.pdf

Elise Thompson

About Elise Thompson

Born and raised in the great city of Los Angeles, this food, culture and music-loving punk rock angeleno wants to turn you on to all that is funky, delicious and weird in the city. While Elise holds down the fort, her adventurous alter ego Kiki Maraschino is known to roam the country in search of catfish.
This entry was posted in Miscellanious and tagged , . Bookmark the permalink.

One Response to 405 Freeway Closures

  1. I guess the last “Carmageddon” was so insignificant that CalTrans decided not to give the full court press blitz this time. (People probably wouldn’t believed it anyway!!)

Leave a Reply